Pitch Refurbishment 2020/21

Chronological gallery documenting the refurbishment of the artificial pitch at Goosedale Sports Club.

Volunteers starting dismantling the old, weathered perimeter fence Im thumb
Volunteers moving the old boards out of the way Im thumb
The folks from Shred & Recycle removing the old sand-filled pitch Im thumb
Tarmac base revealed after the old pitch and shock pad have gone Im thumb
Cleaning the base and power washing the perimeter tarmac Im thumb
Installing the new, laser-levelled insitu rubber shock pad Im thumb
Delivery of the new Hatko hockey turf Im thumb
Posts for new weld mesh fence in place Im thumb
Fence panels and gates added Im thumb

Sponsors Area

© 2011 - 2024 Nottingham Hockey Club. All rights reserved.

To contact your Data Controller, click here

@Nottmhockey

If you wish to withdraw consent from us holding your personal data please email [email protected] requesting your data be removed from the site. However, this will only be possible if you cease your membership.

In addition, if you wish to exercise your right to be forgotten please click here

Powered by ClubBuzz.

Details of Data Controller are

Name: Adam George

Email: [email protected]